Location:
Abingdon, UK
Business Sector:
Petro-Chemical
Principal Contractor:
Masterton
Project Value:
£3,158,850
Duration:
49 weeks
Overview
The contract called for the complete demolition and ground remediation of a former research facility.
The site comprised of over 30 buildings ranging from large scale laboratories, office buildings, test
beds, work shops constructed in the 1950’s & 1960’s through to a 20m high heavily reinforced
marine engine test facility built in the 1980’s. The surrounding infrastructure included a tank farm
with 55 above and below ground fuel storage tanks ranging from 4,000 – 54,000 litre capacity.
The scope included the removal of all types of notifiable asbestos, soft strip of biodegradable
materials, hydrocarbon and pharmaceutical decontamination, decontamination and gas freeing of all
tanks and pipe work, discrete dismantling of assets earmarked for resale and reuse, mechanical
dismantling and demolition, crush, screen and grade 37,500m³ of rubble to a reusable specification
(comprising slabs, foundations) concluded with the excavation and decontamination and treatment
of hot spot contamination of 13,600m³ soil from the former tank farm area, bio-remediated and
backfilled to the satisfaction of both the EA and client. The remediation phase of works was carried
out simultaneously with the demolition works.
Total Site Clearance - Scope of Works
The scope of works incorporated a number of disciplines which encompassed the majority of the
services offered by Masterton from inhouse, utilising a range of personnel peaking at 56, at the
busiest times 26 demolition excavators from Masterton’s fleet were utilised. The working area was
within an area of outstanding natural beauty requiring detail protection of flora and fauna, including
constraints imposed by an ecological survey (to re-house the bat population).
Industrial Services
Industrial Cleaning to specified areas, pipe lines, tanks contaminated with bulk/residual chemical /
hydrocarbon product to an exacting gas free standard, carried out by our in house resources using a
combination of in-line pipe cleaning, vacuum extraction & high pressure steam cleaning methods.
The buildings and items of plant were heavily contaminated with all varieties of Asbestos, removal
of which was carried out by our fully qualified ARCA registered teams. The works included removal
of AIB, asbestos limpet, vessel and pipe lagging using a combination of habitat enclosure and wrap
and cut techniques. The Industrial Dismantling was designed by our engineers to maintain
structural integrity during Asset Recovery of specialist processing plant and equipment using
specialist removal resources. All lifting operations were designed and managed by our resident
engineers to BS7121. Specialised Demolition followed soft strip and structural divorce of abutting
buildings by our resources. Foundations and hard standings were lifted and processed using our
concrete breaking and crushing equipment with all materials processed to the specification for
structural fill and re-used in the works. Ground Remediation was carried out by our resources
designed / executed to the standards / specification laid out in the environmental specification to
attain the specified SSTL’s as agreed with the EA using our own resources, engineers and
scientists, with works executed under our own mobile treatment licence.
Summary
In line with our accredited IMS systems we maximised the project recycling targets exceeding our
target of 95%. The project involved our own fleet of demolition excavators on a combination of
configurations ranging from high reach (28m), through to plate shear, concrete breakers,
mechanical muncher, rotating grab and bucket. The crushing works were carried out by our own
plant and equipment. We only utilised site service suppliers as opposed to sub contractors.